150 Walton Street
• Basement excavation with Delta membranes, drainage and pumping station
• Installation of new slate and single ply membrane roof coverings
• Ribdeck flooring
• Glazed roof incorporating the AOV smoke vent to the side of the closet wing
• New incoming three phase supply and cast-iron drainage
• Full first phase fit out of shop at ground floor and basement to new tenants specification
• Refurbishment of first and second floor flats, including mechanical and electrical services, fitted kitchens and sanitaryware, plastering throughout, new tiling to bathrooms, decorated and new flooring throughout